The cycle time is 10 to 15 minutes with component sizes of max. 7.0 x 2.5 x 2.5 m and weights of 2 tonnes. The centre features pre-treatment, blasting, priming, top-coating and drying lines, which can be driven to in succession or individually. A special highlight is the direct connection to the assembly lines, so that the painted parts do not have to be handled intermediately and can be removed just in time directly at the stations concerned. The plant automatically detects the component width and fills three-lane lines with one wide part, two medium parts or three narrow parts, which then fill the available places in parallel. For the second expansion stage, large buffers at the second level and robot coating in one of the painting lines are prepared. The connection to additional assembly lines and processes extending up to automated guided vehicle systems is possible.